First Majestic Produces 7.9 Million AgEq Ounces in Q2 2025 Consisting of 3.7 Million Silver Ounces and 33,865 Gold Ounces; Announces Improved 2025 Production and Cost Guidance and Conference Call Details
First Majestic Silver (NYSE:AG) reported strong Q2 2025 production with 7.9 million silver equivalent ounces, a 48% increase year-over-year. Production included 3.7 million silver ounces (up 76% Y/Y) and 33,865 gold ounces.
The company has positively revised its 2025 guidance, now expecting 30.6-32.6 million AgEq ounces, a 7% increase from previous guidance. Production improvements were seen across all mines, with Los Gatos, Santa Elena, and San Dimas exceeding expectations. The capital budget was increased by 7% to $193 million to support growth initiatives.
Cash costs are projected to improve to $13.94-$14.37 per ounce, while AISC is expected at $20.02-$20.82 per AgEq ounce.
First Majestic Silver (NYSE:AG) ha riportato una solida produzione nel secondo trimestre del 2025 con 7,9 milioni di once equivalenti d'argento, un aumento del 48% rispetto all'anno precedente. La produzione ha incluso 3,7 milioni di once d'argento (in crescita del 76% su base annua) e 33.865 once d'oro.
L'azienda ha rivisto al rialzo le previsioni per il 2025, prevedendo ora 30,6-32,6 milioni di once equivalenti d'argento, un incremento del 7% rispetto alle stime precedenti. I miglioramenti produttivi sono stati registrati in tutte le miniere, con Los Gatos, Santa Elena e San Dimas che hanno superato le aspettative. Il budget per il capitale è stato aumentato del 7%, arrivando a 193 milioni di dollari per sostenere le iniziative di crescita.
I costi in contanti sono previsti in miglioramento a 13,94-14,37 dollari per oncia, mentre il costo all-in-sustaining (AISC) è stimato tra 20,02 e 20,82 dollari per oncia equivalente d'argento.
First Majestic Silver (NYSE:AG) reportó una sólida producción en el segundo trimestre de 2025 con 7,9 millones de onzas equivalentes de plata, un aumento del 48% interanual. La producción incluyó 3,7 millones de onzas de plata (un 76% más que el año anterior) y 33.865 onzas de oro.
La compañÃa ha revisado al alza su guÃa para 2025, esperando ahora 30,6-32,6 millones de onzas equivalentes de plata, un incremento del 7% respecto a la guÃa anterior. Se observaron mejoras en la producción en todas las minas, con Los Gatos, Santa Elena y San Dimas superando las expectativas. El presupuesto de capital se incrementó un 7%, alcanzando los 193 millones de dólares para apoyar las iniciativas de crecimiento.
Se proyecta que los costos en efectivo mejoren a 13,94-14,37 dólares por onza, mientras que el AISC se espera entre 20,02 y 20,82 dólares por onza equivalente de plata.
First Majestic Silver (NYSE:AG)ëŠ� 2025ë…� 2분기ì—� 790ë§� 온스 ì€ í™˜ì‚° ìƒì‚°ëŸ�ì� 기ë¡í•˜ë©° ì „ë…„ 대ë¹� 48% ì¦ê°€í•� ê°•ë ¥í•� 실ì ì� ë³´ê³ í–ˆìŠµë‹ˆë‹¤. ìƒì‚°ëŸ‰ì—ëŠ� 370ë§� 온스 ì€ (ì „ë…„ 대ë¹� 76% ì¦ê°€)ê³� 33,865 온스 ê¸�ì� í¬í•¨ë˜ì—ˆìŠµë‹ˆë‹�.
회사ëŠ� 2025ë…� ê°€ì´ë˜ìŠ¤ë¥¼ ê¸ì •ì 으ë¡� ìˆ˜ì •í•˜ì—¬, ì´ì „ ê°€ì´ë˜ìŠ¤ë³´ë‹� 7% ì¦ê°€í•� 3,060ë§Œ~3,260ë§� 온스 ì€ í™˜ì‚°ì� 예ìƒí•˜ê³ 있습니다. ëª¨ë“ ê´‘ì‚°ì—서 ìƒì‚° ê°œì„ ì� ì´ë£¨ì–´ì¡Œìœ¼ë©°, Los Gatos, Santa Elena, San Dimas ê´‘ì‚°ì� 기대ë¥� 초과 달성했습니다. 성장 ì´ë‹ˆì…”티브를 ì§€ì›í•˜ê¸� 위해 ìžë³¸ ì˜ˆì‚°ì€ 7% ì¦ê°€í•� 1ì–� 9,300ë§� 달러ë¡� ì±…ì •ë˜ì—ˆìŠµë‹ˆë‹�.
현금 ë¹„ìš©ì€ ì˜¨ìŠ¤ë‹� 13.94´Ê14.37달러ë¡� ê°œì„ ë� ì „ë§ì´ë©°, AISCëŠ� 온스ë‹� 20.02~20.82달러 ì€ í™˜ì‚°ìœ¼ë¡œ 예ìƒë©ë‹ˆë‹�.
First Majestic Silver (NYSE:AG) a annoncé une forte production au deuxième trimestre 2025 avec 7,9 millions d'onces équivalentes argent, soit une augmentation de 48 % en glissement annuel. La production comprenait 3,7 millions d'onces d'argent (en hausse de 76 % sur un an) et 33 865 onces d'or.
La société a révisé à la hausse ses prévisions pour 2025, s'attendant désormais à 30,6-32,6 millions d'onces équivalentes argent, soit une augmentation de 7 % par rapport aux prévisions précédentes. Des améliorations de production ont été observées dans toutes les mines, Los Gatos, Santa Elena et San Dimas dépassant les attentes. Le budget d'investissement a été augmenté de 7 % pour atteindre 193 millions de dollars afin de soutenir les initiatives de croissance.
Les coûts en espèces devraient s'améliorer à 13,94-14,37 dollars par once, tandis que le coût tout compris soutenable (AISC) est attendu entre 20,02 et 20,82 dollars par once équivalente argent.
First Majestic Silver (NYSE:AG) meldete eine starke Produktion im zweiten Quartal 2025 mit 7,9 Millionen Silberäquivalent-Unzen, was einem Anstieg von 48 % gegenüber dem Vorjahr entspricht. Die Produktion umfasste 3,7 Millionen Unzen Silber (ein Plus von 76 % im Jahresvergleich) und 33.865 Unzen Gold.
Das Unternehmen hat seine Prognose für 2025 positiv angepasst und erwartet nun 30,6-32,6 Millionen Silberäquivalent-Unzen, was einer Steigerung von 7 % gegenüber der vorherigen Prognose entspricht. Produktionssteigerungen wurden in allen Minen verzeichnet, wobei Los Gatos, Santa Elena und San Dimas die Erwartungen übertrafen. Das Investitionsbudget wurde um 7 % auf 193 Millionen US-Dollar erhöht, um Wachstumsinitiativen zu unterstützen.
Die Cash-Kosten sollen sich auf 13,94-14,37 US-Dollar pro Unze verbessern, während die AISC voraussichtlich bei 20,02-20,82 US-Dollar pro Silberäquivalent-Unze liegen werden.
- Total silver equivalent production increased 48% Y/Y to 7.9M AgEq ounces
- Silver production surged 76% Y/Y to 3.7M ounces
- Improved 2025 production guidance by 7% to 30.6-32.6M AgEq ounces
- Cash costs guidance improved to $13.94-$14.37 per ounce from previous $14.10-$14.86
- Los Gatos achieved record mill throughput of 4,125 tonnes per day in June
- New high-grade gold and silver vein discovery at Santa Elena property
- Weather-related disruptions and power outages impacted production at multiple mines in June
- Gold production decreased 14% Y/Y to 33,865 ounces
- Capital budget increased 7% to $193 million, requiring additional investment
- Lower grade ores reported at Santa Elena's Ermitaño mine
- La Encantada experiencing lower silver grades (106 g/t vs 129 g/t Y/Y)
Insights
First Majestic reports strong Q2 production with 76% higher silver output, raises 2025 guidance amid operational improvements and favorable metal prices.
First Majestic Silver delivered a robust second quarter with 7.9 million silver equivalent ounces produced, representing a
The company's operational performance demonstrates considerable strength across most assets. Los Gatos achieved record mill throughput of 4,125 tonnes per day in June, showing promising integration progress. San Dimas posted a
Based on this strong first-half performance, management has revised its 2025 guidance upward. Total attributable production is now projected at 30.6-32.6 million silver equivalent ounces, a
This revised outlook is supported by higher metal price assumptions (
The improved guidance and strong operational trajectory demonstrate that First Majestic is capitalizing on favorable precious metals markets while successfully integrating a major acquisition and maintaining cost discipline. Particularly encouraging is the discovery of a second high-grade vein system (Santo Niño) at Santa Elena, highlighting exploration upside potential beyond current production.
Vancouver, British Columbia--(Newsfile Corp. - July 8, 2025) - First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) (the "Company" or "First Majestic") announces that total production in the second quarter of 2025 from the Company's four producing underground mines in Mexico, namely the Los Gatos Silver Mine (the Company holds a
"First Majestic continues to deliver on the commitments made at the start of the year," said Keith Neumeyer, President & CEO. "During the first half of the year, our operations achieved strong and consistent production, supported by disciplined cost management. We closed Q2 ahead of budget with strong momentum, despite weather-related disruptions and power outages in the final days of June that impacted production at Los Gatos, San Dimas and La Encantada. Looking ahead, we are revising our 2025 guidance positively to reflect improved production and cost targets. The integration of Los Gatos is progressing well, with numerous synergies and opportunities already being identified and leveraged. Operational performance at Santa Elena and San Dimas continues to meet or exceed expectations, allowing us to capitalize on the favourable metal price environment. While La Encantada had a slower start to the year, we anticipate a stronger second half, with both production and cost performance expected to improve."
Q2 2025 PRODUCTION HIGHLIGHTS
Silver Production (+
76% Y/Y): The Company produced 3.7 million silver ounces in Q2 2025 representing a76% increase when compared to 2.1 million silver ounces produced in Q2 2024. Total silver production in the quarter included 1.5 million ounces of attributable silver production from Los Gatos.Silver Equivalent Production (+
48% Y/Y): The Company produced 7.9 million AgEq ounces in Q2 2025, a48% increase compared to 5.3 million AgEq ounces in Q2 2024. This growth was primarily driven by a76% increase in attributable silver production, including contributions from Los Gatos, as well as a17% production increase at San Dimas.Continued Active Exploration Program: During the second quarter, the Company completed a total of 67,830 metres ("m") of drilling across its mines in Mexico. Throughout the quarter, up to 28 drill rigs were active consisting of seven rigs at Los Gatos, seven rigs at Santa Elena, 13 rigs at San Dimas and one rig at La Encantada.
High-Grade Gold and Silver Discovery: The Company announced the discovery of a second new, high-grade gold and silver vein hosted system - Santo Niño - at the Santa Elena property (see news release dated ). The Santo Niño discovery is 900 m south of the Santa Elena plant and is the second significant discovery made by the Company in the past 12 months.
Strong Safety Performance Continues: The consolidated Q2 2025 Total Reportable Incident Frequency Rate ("TRIFR") was 0.52, below the Company's 2025 target KPI of 0.70. The Lost Time Incident Frequency Rate ("LTIFR") was 0.11 compared to 0.12 from the same period last year.
Attributable Consolidated Production Details:
Q2 | Q2 | Y/Y | Q1 | Q/Q | |
2025 | 2024 | Change | Attributable Consolidated Production Results | 2025 | Change |
1,003,804 | 674,570 | Ore processed/tonnes milled | 944,373 | ||
7,852,311 | 5,289,439 | Silver equivalent ounces produced | 7,711,709 | ||
3,701,995 | 2,104,181 | Silver ounces produced | 3,704,503 | ||
33,865 | 39,339 | (14)% | Gold ounces produced | 36,469 | (7)% |
16,063,947 | N/A | N/A | Zinc pounds produced | 12,492,869 | |
9,014,545 | N/A | N/A | Lead pounds produced | 7,487,065 |
- Consolidated production values include attributable ounces from the Los Gatos Silver Mine (
70% ) from January 16, 2025 onwards.
Q2 2025 Mine-by-Mine Production Details:
Mine | Ore Processed | Tonnes per Day | Ag Grade (g/t) | Au Grade (g/t) | Ag Recovery | Au Recovery | Ag Oz Produced | Au Oz Produced | AgEq Oz Produced |
Los Gatos ( | 333,543 | 3,665 | 230 | 0.20 | 2,178,499 | 1,009 | 3,481,031 | ||
Los Gatos ( | 233,480 | 2,566 | 230 | 0.20 | 1,524,949 | 706 | 2,436,722 | ||
Santa Elena | 269,830 | 2,965 | 55 | 2.54 | 306,224 | 20,637 | 2,318,618 | ||
San Dimas | 219,198 | 2,409 | 197 | 1.90 | 1,242,717 | 12,472 | 2,464,029 | ||
La Encantada | 281,296 | 3,091 | 106 | 0.01 | 628,105 | 49 | 632,942 |
- Certain amounts shown in this table may not add exactly to the total amount due to rounding differences
- The metal prices that were used to calculate the silver equivalent ounces were, silver:
$33.46 /oz; gold:$3,270.57 /oz; lead:$0.88 /lb.; and zinc:$1.20 /lb. - Silver equivalent ounces for the Los Gatos Silver Mine include 16,063,947 lbs. zinc and 9,014,545 lbs. lead (
70% attributable basis) and 22,948,496 lbs. zinc and 12,877,921 lbs. lead (100% basis)
Los Gatos Silver Mine (reported on a
During the second quarter, Los Gatos produced 2,436,722 attributable AgEq ounces, consisting of 1,524,949 ounces of silver, 16,063,947 pounds of zinc, 9,014,545 pounds of lead and 706 ounces of gold. Production at Los Gatos was slightly impacted at the end of June due to a weather-related power outage that lasted three days. Power was fully restored on July 1, 2025.
The mill processed a total of 233,480 tonnes of ore, with head grades of 230 g/t silver, 4.24 % zinc,
2.00% lead and 0.20 g/t gold. Management continues to focus on achieving a sustainably higher mill throughput at Los Gatos. In June, the mill reached a record average of 4,125 tonnes per day ("tpd"), based on operating days.Silver, zinc, lead and gold recoveries during the quarter averaged
88% ,74% ,88% and47% , respectively.During the quarter, five drill rigs completed 12,788 m of drilling on the property.
Santa Elena Silver/Gold Mine:
Santa Elena produced 2,318,618 AgEq ounces during the quarter, a decrease of
10% year-over-year, consisting of 306,224 ounces of silver and 20,637 ounces of gold. The decline in production was a result of lower grade ores from the Ermitaño mine and aligns with the mine plan. Q2 production was ahead of budget.The mill processed a total of 269,830 tonnes of ore,
5% higher than the same period last year, with average silver and gold head grades of 55 g/t and 2.54 g/t, respectively. Silver and gold ore grades declined28% and20% , respectively, in line with the mine plan.Silver and gold recoveries during the quarter averaged
64% and94% , respectively, compared to66% and94% in the same period last year.During the quarter, seven drill rigs, consisting of five surface rigs and two underground rigs, completed 22,751 m of drilling on the property.
San Dimas Silver/Gold Mine:
San Dimas produced 2,464,029 AgEq ounces during the quarter representing a
17% increase compared to Q2 2024, consisting of 1,242,717 ounces of silver and 12,472 ounces of gold. Silver production increased by9% , while gold production increased by4% , when compared to the same period last year. Quarterly performance was impacted by lower mined gold grades and a weather-related power interruption at the end of June that required electrical grid maintenance.The mill processed a total of 219,198 tonnes of ore, an increase of
20% compared to Q2 2024, with average silver and gold grades of 197 g/t and 1.90 g/t, respectively, compared with 210 g/t and 2.15 g/t in the same period last year. Higher throughput was driven by increased mining rates, which enabled the buildup of an ore stockpile and supported above-nameplate mill performance during the quarter.Silver and gold recoveries during the quarter averaged
90% and93% , respectively, compared to92% and95% in the same period last year.During the quarter, a total of 13 drill rigs consisting of three surface rigs and 10 underground rigs completed 29,746 m of drilling on the property.
La Encantada Silver Mine:
During the quarter, La Encantada produced 628,105 ounces of silver, representing a
7% increase compared to Q2 2024, driven primarily by a20% increase in ore processed, and an8% increase in silver recovery, partially offset by lower silver grades. Production at La Encantada was slightly impacted in June by a severe weather event that disrupted power to the water pumping system. Power has since been restored, and production levels are returning to normal.The mill processed a total of 281,296 tonnes of ore, a
20% increase over the same period last year, with an average silver grade of 106 g/t, compared to 129 g/t in the same period last year.Silver recovery for the quarter was
65% , compared to60% in Q2 2024. The improvement was primarily driven by the addition of lead nitrate and increased residence time, supported by improved water availability compared to the same period last year.During the quarter, one underground drill rig completed 2,546 m of drilling on the property.
2025 OUTLOOK
The Company is updating its full year 2025 guidance, primarily to reflect the following changes:
Improved metal price environment: The silver and gold price assumptions for the second half of 2025 have been revised to
$30.00 and$2,800 per ounce, respectively.Los Gatos: Management is increasing the Los Gatos attributable production forecast to 9.1 - 9.7 million AgEq ounces, an increase of
6% (mid-point) compared to the original guidance. The revision is primarily driven by higher throughput rates and slightly improved silver grades, with a long-term objective of achieving and sustaining a throughput level of 4,000 tpd.Santa Elena: Management is increasing the Santa Elena production forecast to 8.8 - 9.4 million AgEq ounces, an increase of
12% (mid-point) compared to the original guidance, primarily due to higher gold grades and slightly increased gold recoveries.San Dimas: Management is increasing the San Dimas production forecast to 9.9 - 10.5 million AgEq ounces, an increase of
7% (mid-point) compared to the original guidance, primarily due to higher throughput rates.Capital Investments: Management has increased the 2025 capital budget by
7% to$193 million to support key growth initiatives, including the plant expansion at Santa Elena, early-stage development at the Navidad discovery, and the acquisition of additional equipment to enhance and sustain higher throughput rates at Los Gatos.
As a result of the Company's strong production results in H1 2025 and continued operating efficiencies, the 2025 attributable consolidated production guidance has increased to 30.6 - 32.6 (mid-point: 31.6) million AgEq ounces, representing a
A mine-by-mine breakdown of the Company's revised 2025 production and cost guidance is included in the table below. The Company reports cost guidance to reflect cash costs and all-in sustaining costs ("AISC") on a per AgEq attributable payable ounce basis. The metal price and foreign currency assumptions that were used to calculate the numbers below were: silver:
Guidance for Full Year 2025:
Operation | Silver Oz (M) | Gold Oz (k) | Lead Lbs (M) | Zinc Lbs (M) | Silver Eqv. Oz (M) | Cash Cost ($ per AgEq Oz) | AISC ($ per AgEq Oz) |
Los Gatos, Mexico ( | 5.6 - 6.0 | 3 | 33 - 35 | 52 - 56 | 9.1 - 9.7 | 11.14 - 11.46 | 14.62 - 15.13 |
Santa Elena, Mexico | 1.5 - 1.6 | 79 - 84 | - | - | 8.8 - 9.4 | 13.56 - 13.95 | 17.39 - 18.02 |
San Dimas, Mexico | 4.9 - 5.2 | 53 - 57 | - | - | 9.9 - 10.5 | 14.11 - 14.56 | 18.38 - 19.10 |
La Encantada, Mexico | 2.8 - 3.0 | - | - | - | 2.8 - 3.0 | 22.29 - 23.15 | 28.16 - 29.42 |
Operations Total | 14.8 - 15.8 | 135 - 144 | 33 - 35 | 52 - 56 | 30.6 - 32.6 | ||
Corporate | |||||||
Corp. G&A and Services | - | - | - | - | - | - | 1.91 - 2.03 |
Total Consolidated | 14.8 - 15.8 | 135 - 144 | 33 - 35 | 52 - 56 | 30.6 - 32.6 |
- Certain amounts shown in the above table may not add exactly to the total amount due to rounding differences.
- Cash Costs and AISC are non-GAAP measures and are not standardized financial measures under the Company's financial reporting framework. The Company calculates cash costs and consolidated AISC in the manner set out in the table below. These measures have been calculated on a basis consistent with historical periods. See "Non-GAAP Measures" at the end of this news release for further details regarding these measures.
For the full year of 2025, the Company now estimates silver production will range between 14.8 to 15.8 million ounces compared to the prior guidance of 13.6 to 15.3 million ounces, a
Annual cash costs are now expected to be within the range of
The Company is projecting its consolidated 2025 AISC to be within the range of
All-In Sustaining Cost Calculation | FY 2025 ($ per AgEq oz) |
Total Cash Costs per Payable Equivalent Silver Ounce | 13.94 - 14.37 |
General and Administrative Costs | 1.46 - 1.56 |
Sustaining Development Costs | 0.68 - 0.71 |
Sustaining Property, Plant and Equipment Costs | 1.77 - 1.88 |
Profit Sharing | 1.03 - 1.09 |
Lease Payments | 0.53 - 0.56 |
Share-based Payments (non-cash) | 0.45 - 0.48 |
Accretion and Reclamation Costs (non-cash) | 0.16 - 0.17 |
All-In Sustaining Costs (AgEq Oz) | |
All-In Sustaining Costs (AgEq Oz excluding non-cash items) |
- Certain amounts shown may not add exactly to the total amount due to rounding differences.
- AISC is a non-GAAP measure and is calculated based on the Company's consolidated operating performance. Other mining companies may calculate AISC differently as a result of differences in: underlying accounting principles; the definition of "sustaining costs"; and the distinction between sustaining and expansionary capital costs. See "Non-GAAP Measures" at the end of this news release for further details.
- Consolidated AISC includes general and administrative cost estimates and non-cash costs of
$2.07 t o$2.21 per AgEq ounce.
UPDATED CAPITAL INVESTMENTS IN 2025
In 2025, the Company plans to invest approximately
Capital Guidance for 2025:
Area | Sustaining ($M) | Expansionary ($M) | Total ($M) |
Underground Development | |||
Exploration | - | ||
Property, Plant and Equipment | |||
Corporate Projects | - | ||
Total |
The updated 2025 annual guidance includes total capital investments of
Under the updated 2025 budget, the Company is planning to complete a total of approximately 44,000 m of lateral underground development, representing a
In the first half of 2025, the Company completed 23,100 m of underground development drilling and 128,141 m of exploration drilling.
Management may revise the Company's guidance during the year to reflect actual and anticipated changes in metal prices or to the business. There can be no assurance that cost estimates related to the Company's 2025 guidance will prove to be accurate. For further details regarding risks related to the allocation of capital by the Company, see the section in the Company's most recently filed Annual Information Form ("AIF") entitled "Risk Factors - Financial Risks - Allocation of Capital - Sustaining and Expansionary Capital".
CONFERENCE CALL DETAILS
The Company will host a conference call and webcast on Thursday, August 14, 2025, at 8:00 a.m. (PT) / 11:00 a.m. (ET) to provide investors and analysts with a business update, and to discuss its second quarter production and earnings results and updated 2025 guidance. The Company will issue a further news release closer to the date of the conference call to remind investors of the call details.
To participate in the conference call, please use the following dial-in numbers:
Canada & USA Toll-Free: | +1-833-752-3407 |
Outside of Canada & USA: | +1-647-846-2866 |
Toll-Free Germany: | +49-69-1741-5718 |
Toll-Free UK: | +44-20-3795-9972 |
Participants should dial-in at least 15 minutes prior to the start of the call to ensure placement in the conference on time.
A live webcast of the call will be accessible through the "August 14, 2025 Webcast Link" on the First Majestic home page at . A webcast archive will be available approximately one hour after the end of the event and will be accessible for three months through the same link as the live event.
A recording of the conference call will be available for telephone replay approximately one hour after the end of the event by calling:
USA & Canada Toll-Free: | +1-855-669-9658 |
Outside of Canada & US: | +1-412-317-0088 |
Access Code: | 1902689 |
The telephone replay will be available for seven days following the end of the event.
ABOUT FIRST MAJESTIC
First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates four producing underground mines in Mexico: the Los Gatos Silver Mine (the Company holds a
First Majestic is proud to own and operate its own minting facility, First Mint, LLC, and to offer a portion of its silver production for sale to the public. Bars, ingots, coins and medallions are available for purchase online at , at some of the lowest premiums available.
For further information, contact [email protected], visit our website at or call our toll free number 1.866.529.2807.
FIRST MAJESTIC SILVER CORP.
"signed"
Keith Neumeyer, President & CEO
Non-GAAP Financial Measures
This news release includes reference to certain financial measures which are not standardized measures under the Company's financial reporting framework. These measures include cash costs per attributable silver equivalent ounce produced and AISC per attributable silver equivalent ounce produced. The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. These measures are widely used in the mining industry as a benchmark for performance but do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures disclosed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For a complete description of how the Company calculates such measures and a reconciliation of certain measures to GAAP terms please see "Non-GAAP Measures" in the Company's most recent management discussion and analysis filed on SEDAR+ at and EDGAR at .
Cautionary Note Regarding Forward Looking Statements
This news release contains "forward‐looking information" and "forward-looking statements" under applicable Canadian and U.S. securities laws (collectively, "forward‐looking statements"). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends, current conditions and expected future developments. Forward-looking statements in this news release include, but are not limited to, statements with respect to: the assumptions used by the Company for its updated 2025 production and cost guidance; statements relating to the Company's capital investments in 2025; the Company's business strategy; future planning processes; commercial mining operations; budgets; the timing and amount of estimated future production, AISC and cash costs; costs and timing of development at the Company's projects; capital projects and exploration activities for 2025 and the possible results thereof; drilling programs in 2025, including potential exploration activities at the Navidad discovery at Santa Elena and the Central and North-West Deep zones at the Los Gatos Silver Mine; and details regarding the Company's investor conference call in August 2025 to discuss its updated production and cost guidance. Assumptions may prove to be incorrect and actual results and future events may differ materially from those anticipated. Consequently, guidance cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon guidance and forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐looking statements. Statements concerning proven and probable mineral reserves and mineral resource estimates may also be deemed to constitute forward‐looking statements to the extent that they involve estimates of the mineralization that will be encountered as and if the property is developed, and in the case of measured and indicated mineral resources or proven and probable mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward‐looking statements".
Actual results may vary from forward-looking statements. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward-looking statements, including but not limited to: the duration and effects of global health crises, such as pandemics, on our operations and workforce, and the effects on global economies and society; general economic conditions including inflation risks; actual results of exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; commodity prices; variations in ore reserves, grade or recovery rates; actual performance of plant, equipment or processes relative to specifications and expectations; accidents; labour relations; social and labour unrest; relations with local communities; changes in national or local governments; changes in applicable legislation, rules or regulations and the application and enforcement thereof; delays in obtaining approvals or financing or in the completion of development or construction activities; exchange rate fluctuations; requirements for additional capital; government regulation; environmental risks; reclamation expenses; outcomes of pending litigation; limitations on insurance coverage as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in the Company's most recent Annual Information Form for the year ended December 31, 2024 filed with the Canadian securities regulatory authorities under the Company's SEDAR+ profile at , and in the Company's Annual Report on Form 40-F for the year ended December 31, 2024 filed with the United States Securities and Exchange Commission on EDGAR at . Although First Majestic has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.
The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws.
To view the source version of this press release, please visit