AGÕæÈ˹ٷ½

STOCK TITAN

Trident Resources To Commence 5,000m Diamond Drilling Program on Contact Lake High-Grade Gold Project, Saskatchewan

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Very Positive)
Tags

Trident Resources (OTCQB:TRDTF) has announced a significant 5,000-metre diamond drilling program at its Contact Lake Gold Project in Saskatchewan's La Ronge Gold Belt. The company, with CAD $11 million in cash and marketable securities, will execute 16 drill holes targeting the extension of gold mineralization at the former Cameco-operated mine site.

The Contact Lake mine historically produced 188,185 ounces of gold from 1994-1998, processing 1,006,673 tonnes of ore at 6.16 g/t Au with a 95% recovery rate. The drilling program will focus on the Bakos shear zone, which extends over 2 km and ranges from 15 to 40 metres in width, targeting areas between underground development and unmined BK3 zone resources.

Trident Resources (OTCQB:TRDTF) ha annunciato un importante programma di perforazione diamantina di 5.000 metri presso il suo progetto aurifero Contact Lake nella La Ronge Gold Belt, Saskatchewan. La società, con CAD $11 milioni in contanti e titoli negoziabili, eseguirà 16 fori di sondaggio mirati a estendere la mineralizzazione aurifera nell'ex sito minerario gestito da Cameco.

La miniera di Contact Lake aveva prodotto storicamente 188.185 once d'oro dal 1994 al 1998, trattando 1.006.673 tonnellate di minerale a 6,16 g/t Au con un tasso di recupero del 95%. Il programma di perforazione si concentrerà sulla faglia Bakos, che si estende per oltre 2 km e varia da 15 a 40 metri di larghezza, prendendo di mira le aree tra lo sviluppo sotterraneo e le risorse non estratte della zona BK3.

Trident Resources (OTCQB:TRDTF) ha anunciado un importante programa de perforación diamantina de 5.000 metros en su proyecto aurífero Contact Lake, dentro de la La Ronge Gold Belt en Saskatchewan. La compañía, con CAD $11 millones en efectivo y valores negociables, realizará 16 sondajes dirigidos a extender la mineralización de oro en el antiguo yacimiento operado por Cameco.

La mina Contact Lake produjo históricamente 188.185 onzas de oro entre 1994 y 1998, procesando 1.006.673 toneladas de mineral a 6,16 g/t Au con una recuperación del 95%. El programa de perforación se centrará en la zona de cizalla Bakos, que se extiende más de 2 km y tiene entre 15 y 40 metros de anchura, apuntando a las áreas entre el desarrollo subterráneo y los recursos no explotados de la zona BK3.

Trident Resources (OTCQB:TRDTF)ëŠ� 사스카치ì›ì£¼ì� La Ronge Gold Beltì—� 위치í•� Contact Lake ê¸� 프로ì íЏì—서 5,000미터 다ì´ì•„몬ë“� 시추 프로그램ì� 시행한다ê³� 발표했습니다. 회사ëŠ� 현금 ë°� 유가ì¦ê¶Œìœ¼ë¡œ CAD $11 millionì� 보유하고 있으ë©�, ì´ì „ì—� Camecoê°€ ìš´ì˜í•˜ë˜ ê´‘ì‚° 부지ì—서 ê¸� 광화대ë¥� 확장하기 위해 16ê°œì˜ ì‹œì¶”ê³µì„ ìˆ˜í–‰í•� 예정입니ë‹�.

Contact Lake ê´‘ì‚°ì€ 1994ë…„ë¶€í„� 1998년까지 역사ì ìœ¼ë¡� 188,185온스ì� ê¸�ì� ìƒì‚°í–ˆìœ¼ë©�, 1,006,673í†¤ì˜ ê´‘ì„ì� 6.16 g/t Au 등급으로 처리했고 íšŒìˆ˜ìœ¨ì€ 95%였습니ë‹�. 시추 í”„ë¡œê·¸ëž¨ì€ í­ì´ 15~40미터ì´ê³  길ì´ê°€ 2kmê°€ 넘는 Bakos 전단대ë¥� 중심으로 ì§„í–‰ë˜ë©°, ì§€í•� 개발 구간ê³� ë¯¸ì±„êµ´ëœ BK3 구역 ìžì› 사ì´ì� ì˜ì—­ì� 표ì ìœ¼ë¡œ 삼습니다.

Trident Resources (OTCQB:TRDTF) a annoncé un important programme de forage diamanté de 5 000 mètres sur son projet aurifère Contact Lake dans le La Ronge Gold Belt, en Saskatchewan. La société, disposant de 11 millions de CAD en trésorerie et en titres négociables, réalisera 16 forages visant à étendre la minéralisation aurifère sur l'ancien site exploité par Cameco.

La mine de Contact Lake a historiquement produit 188 185 onces d'or entre 1994 et 1998, traitant 1 006 673 tonnes de minerai à 6,16 g/t Au avec un taux de récupération de 95%. Le programme de forage se concentrera sur la zone de cisaillement Bakos, qui s'étend sur plus de 2 km et présente une largeur de 15 à 40 mètres, ciblant les secteurs entre les travaux souterrains et les ressources non exploitées de la zone BK3.

Trident Resources (OTCQB:TRDTF) hat ein bedeutendes 5.000-Meter-Diamantbohrprogramm auf seinem Contact Lake Gold Project im La Ronge Gold Belt in Saskatchewan angekündigt. Das Unternehmen verfügt über CAD $11 Millionen an liquiden Mitteln und marktgängigen Wertpapieren und wird 16 Bohrlöcher niederbringen, die darauf abzielen, die Goldmineralisierung auf dem ehemaligen, von Cameco betriebenen Bergwerksgelände zu verlängern.

Die Contact Lake-Mine förderte historisch 188.185 Unzen Gold von 1994 bis 1998 und verarbeitete 1.006.673 Tonnen Erz mit 6,16 g/t Au bei einer Rückgewinnungsrate von 95%. Das Bohrprogramm konzentriert sich auf die Bakos-Scherszone, die sich über mehr als 2 km erstreckt und 15 bis 40 Meter breit ist, und zielt auf die Bereiche zwischen dem Untertagebau und den ungenutzten BK3-Ressourcen ab.

Positive
  • Strong treasury position of CAD $11 million to fund exploration
  • Historical high-grade production of 6.16 g/t Au with 95% recovery rate
  • Existing underground infrastructure reduces development costs
  • Historical drill results show exceptional grades up to 2,616 g/t Au
Negative
  • Project requires significant exploration to verify historical resources
  • True thickness of mineralization remains unknown
  • Historical sampling was discontinuous with data gaps

Vancouver, BC, Aug. 14, 2025 (GLOBE NEWSWIRE) -- Trident Resources Corp. (TSX-V:Ìý) (OTCQB: ) (â€�Tridentâ€� or the â€�Companyâ€�) is pleased to announce detailed plans for its upcoming inaugural drill program at the Contact Lake Gold Project in Saskatchewan’s underexplored and prolific La Ronge Gold Belt. Trident enters this program with over CAD $11 million in cash and marketable securities, fully funding this drill program and positioning the Company to act swiftly on future exploration opportunities across its Saskatchewan portfolio.

Contact Lake Project Location Map:

"With drilling to be underway within the next week, we are excited to build on our proven track record of discovery and resource growth in the La Ronge Gold District. We believe our gold assets have the potential to become a tier 1 project in Canada and provide a strong foundation for value creation. We are also optimistic that our systematic exploration methodology will deliver success with additional new discoveries in our underexplored district scale land package,� said Jonathan Wiesblatt, CEO of Trident.

The drill program at the Contact Lake mine site will comprise of 5,000 metres across 16 holes with the aim of confirming and extending gold mineralization along strike and down-dip from the historically defined gold mineral resources. The Contact Lake mine was operated by Cameco between December 1994 to May 1998 when 1,006,673 tonnes of ore were processed at a head grade of 6.16 grams per tonne (g/t) Au for a reported 188,185 ounces of gold (Au) recovered with life of mill recovery rate stated at 95%. Contact Lake hosts significant underground infrastructure and exploration potential in the areas immediately adjacent to the underground development. Cameco reported that substantial historically defined gold resources were left in the ground when mining activities were terminated at a time when the gold price was approximately $300/´Ç³Ü²Ô³¦±ð.Ìý

Contact Lake Gold Project Plan View:

The Contact Lake deposit is hosted within the northeast trending Bakos shear zone, which cuts through the granitic portion of the Little Deer Lake composite pluton. The auriferous Bakos shear zone has been drill-defined at between 15 to 40 metres in width over a strike length of greater than 2 km. The 2025 drilling will focus on extending gold mineralization between the underground development and the unmined resources of the BK3 zone, located immediately northeast of the former mine site. Drilling will also target down-dip extensions of the high-grade gold mineralization of the main zone as these types of shear-hosted gold deposits commonly extend at depth providing strong discovery potential below the currently defined dimensions of the Contact Lake deposit.

Cyr Drilling from Winnipeg, Manitoba, has been chosen as the drill contractor and is mobilizing their personnel and drill equipment to Contact Lake. All drill cores will be logged, photographed and processed on site throughout the program. Data collection will include geologic, geotechnical and a full 48 element analytical suite in conjunction with a comprehensive QA / QC program with lab-certified standards, field blanks and duplicates comprising >10% of the sample stream. All 2025 data will be incorporated into the existing Contact Lake database and utilized in future exploration programs on the project.ÌýÌýÌý

Location Map of Planned Drill Holes:

The initial drill holes of the 2025 program will be focused on the discovery of shallow gold mineralization immediately northeast of the Contact Lake Main Zone (MZ1), which produced the majority of gold resources during mining operations. The second phase of drilling will target zones at moderate depth (200-250 metres below surface) that lie between the MZ1 zone and the BK3 zone. The BK3 zone is located 150 metres northeast of MZ1, below the western edge of Contact Lake and is reported to host substantial gold resources that were never mined. The final phase of the 2025 drill program will target the down-plunge extension of the gold mineralization in both the MZ1 and MZ2 zones.ÌýÌý

Drilling will target the heart of the past-producing Contact Lake Mine, following up on historical high-grade intercepts including:

Contact Lake Gold Deposit - Historical Drill Intercepts
Hole ID From (m) To (m) Interval (m) Au (g/t) Description
TU89-125 56.0 76.5 20.5 12.81 length weighted average
TU89-127 39.5 57.8 18.3 10.41 length weighted average
TU90-146 205.3 205.9 0.6 2,616.00 single assay
TU92-316 138.3 138.8 0.5 94.06 single assay
Notes:
*Analytical data sourced from Cameco historical records
*Historical sampling was discontinuous - data gaps were assigned a zero value
*Intervals are drilled intercepts and do not reflect true thickness with true thickness unknownÌý

Qualified Person:

The scientific and technical data contained in this news release was approved by Cornell McDowell, P.Geo., a non-independent “qualified person� under the National Instrument 43-101 Standards of Disclosure of Mineral Projects.

About Trident Resources Corp.:

Trident Resources Corp. is a Canadian public mineral exploration company listed on the TSX Venture Exchange focused on the acquisition, exploration and development of advanced-stage gold and copper exploration projects in Saskatchewan, Canada. The Company is advancing its 100% owned Contact Lake and Greywacke Lake projects which host significant historical gold resources located within the prospective and underexplored La Ronge Gold Belt, as well as the 100% owned Knife Lake copper project which contains a historical copper resource.

To find out more about Trident Resources Corp. (TSX-V: ROCK), visit the Company’s website at

Trident Resources Corp.

Jonathan Wiesblatt, Chief Executive Officer
Email:

For further information contact myself or:
Andrew J. Ramcharan, PhD, P.Eng., Corporate Communications

Trident Resources Corp.
Telephone: 647-309-5130
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email:


NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Forward-Looking Information and Statements

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. ÌýAlthough management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, regulatory approvals, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at Ìýfor further information.



 

FAQ

What is the size of Trident Resources' (TRDTF) planned drilling program at Contact Lake?

Trident Resources plans to conduct a 5,000-metre diamond drilling program across 16 holes at the Contact Lake Gold Project.

How much gold did the Contact Lake mine historically produce?

The Contact Lake mine, operated by Cameco from 1994-1998, produced 188,185 ounces of gold from 1,006,673 tonnes of ore at a grade of 6.16 g/t Au.

What is Trident Resources' (TRDTF) current cash position?

Trident Resources has over CAD $11 million in cash and marketable securities.

What were the best historical drill results at Contact Lake?

The best historical drill intercept was 2,616 g/t Au over 0.6 meters in hole TU90-146, with other notable results including 12.81 g/t Au over 20.5 meters.

Where is the Contact Lake Gold Project located?

The Contact Lake Gold Project is located in Saskatchewan's La Ronge Gold Belt, an underexplored but prolific gold district in Canada.
Trident Resources Corp

OTC:TRDTF

TRDTF Rankings

TRDTF Latest News

TRDTF Stock Data

13.73M
28.15M
4.88%
Other Industrial Metals & Mining
Basic Materials
Canada
Vancouver